- Introduction
Theoretical Base of KF-aby
Test Results
Application Methods
Mercury Waste
Seismic Protective Structures
Kalmatron Product Listing
Contact Us
|
KALMATRON
KF-aßy
TEST RESULTS -
CHINA - Retyped Page 1
Russia
Taiwan
2.2 Testing results
Test results are shown in the table below.
Table 1: KF-aby material shielding effect test
results 2002/03/29
Focus 85 cm
| Types |
Ref No. |
Qnty of Radiation (x10-3Gy/h) |
Stndrd Devia- tion (%) |
Types |
Ref No. |
Qnty of Radiation
(x10-3Gy/h) |
Stndrd Devia- tion (%) |
| Base Panel |
1 |
24 |
2.31 |
Strength of
Emitter |
1 |
12932 |
0.10 |
| 2 |
24 |
4.42 |
2 |
12911 |
0.06 |
| 3 |
23 |
3.85 |
3 |
12897 |
0.30 |
| Ave |
23.7 |
|
Ave |
12913.3 |
|
| 5 cm thick
concrete |
1 |
9026 |
0.23 |
5 cm concrete
panel + 1 cm KF-aby (110 minutes after
application) |
1 |
8208 |
0.05 |
| 2 |
8999 |
0.04 |
2 |
8233 |
0.12 |
| 3 |
8983 |
0.22 |
3 |
8230 |
0.21 |
| Ave |
9002.7 |
|
Ave |
8223.70 |
|
| 5 cm concrete
panel + 2 cm KF-aby |
1 |
7475 |
0.20 |
5 cm concrete
panel + 3 cm KF-aby |
1 |
7008 |
0.11 |
| 2 |
7468 |
0.11 |
2 |
6984 |
0.06 |
| 3 |
7489 |
0.09 |
3 |
6963 |
0.05 |
| Ave |
7477.30 |
|
Ave |
6985.0 |
|
| Note 1 |
The readings
shown in the table are the actual readings, no deductions have
been made from the base control panel. |
| Note 2 |
The 3 cm KF-aby
was applied in two layers. The first layer was 2 cm and
the second layer of 1 cm was applied two hours after the first
layer. |
Retyped Version Page 2
Top of Page
© Copyright 2002 Howell
Enterprises, Inc. All Rights Reserved.
Site Strategy and Design by Brazil
Business Services
|